March Jobsite Tour: Tour of Two Highway Construction Projects

Mar 28, 2024 - 11:00 AM (MT) - Loop 375 (Purple Heart) Widening and Construction of Frontage Roads
Hosted by El Paso, TX

About this Event

Please join us for this opportunity to tour two major construction projects!

We are limited to 13 people for these tours, so don't wait to register!

PHOTOS: America's Widest Highways, Why Expanding Won't Help Traffic

Project 1: Loop 375 (Purple Heart) Widening and Construction of Frontage Roads

  • Consist of widening 4 to 6 lanes on main lanes and constructing 2 lane frontage roads in each direction.

 

Project 2: US 62/180 (Montana Ave)

  • Consists of three controlled-access main lanes in each direction, three frontage road lanes in each direction from Global Reach Drive to SL 375, and two frontage road lanes in each direction from SL 375 to FM 659 (N. Zaragoza Road). The project would also include the construction of sidewalks and landscaping. Two direct connector ramps would be constructed at US 62/180 (Montana Avenue) and Global Reach Drive, and four direct connector ramps would be constructed at the US 62/180 (Montana Avenue) and SL 375.

 

*Meeting point and any PPE requirements will be provided to those that register

Featured Speakers

No presenter information provided.

Price

Members: Free
Non-members: $25.00

Event has passed